In this guide

See how a professional air-conditioning installation progresses from heat-load survey and system design through pipework, electrics, commissioning and handover.

1. Initial requirements

Identify the rooms, comfort problem, occupancy and preferred times of use. Decide whether the priority is cooling, heating or both, and whether the project is one room or part of a phased whole-home plan.

2. Heat-load assessment

The survey considers size, orientation, glazing, insulation, ceiling height, people and equipment. The installer then selects capacity using the proposed manufacturer’s data rather than relying on a generic floor-area rule.

3. Position and route design

Agree every indoor and outdoor position, refrigerant pipe route, drain, cable, isolator and containment finish. Note furniture, wardrobes, curtains, neighbours, boundaries and future service access.

4. Permissions and pre-installation checks

Confirm planning, freeholder, landlord or managing-agent approval where relevant. The electrical supply and protective arrangements should be checked, along with access equipment and any specialist making good.

5. Installation

The team mounts equipment, creates routes, installs pipework and cabling, manages drainage and completes the required electrical work. Open pipework should be protected from contamination while work progresses.

6. Testing and commissioning

The refrigeration circuit is tested and prepared in line with the manufacturer’s requirements before operation. Drainage, controls, temperatures, airflow and both heating and cooling modes are checked as applicable.

7. Handover

You should understand the controller, sensible settings, filter cleaning and what to do if a fault appears. Keep equipment details, commissioning information, warranty records and the maintenance schedule.

See our unit-positioning guide and servicing guide for the decisions that follow the initial design.

Ready to plan your installation?

Start with an owner-led survey and a fixed, clearly defined scope.

Book your survey →

Before you request a quotation

Collect the room dimensions, note when the space overheats, take photos of possible indoor and outdoor positions and confirm whether the property is freehold or leasehold. This gives the designer a useful starting point, but it does not replace a heat-load assessment or site survey.